The project consist of a covered basketball court and a two-storey Recreation Building for the employees of ON SEMICONDUCTOR (formerly Motorola Philippines, Inc.) The Recreation Building has recreational facilities on the ground floor and an Analog Design Center on the second floor.

The covered basketball court has floor area of 821 square meters while the Recreation Building has 1,100 square meters. A two level vaulted roof on the space framed trusses serves to provide natural light and ventilation for the basketball court. On the other hand, the design of the curtain wall of the Recreation Building complements the existing building of this semiconductor facility.

Implementation of the project done in three phases. Phase 1 involved the relocation of an existing service gate and the construction of an open basketball court. Phase 2 involved the construction of the Recreational Buildings and Phase 3 the construction of the roof over the basketball court.

The project was substantially completed in a span of eleven months of non-continuous construction.

RNFA prepared the architectural and engineering design for the project and managed the construction.

PROJECT FACTS

Project Name ANALOG DESIGN AND RECREATION CENTERS

Location Governors Drive, Maduya, Carmona, Cavite

Owner/Client ON Semiconductor (Formerly a Division of Motorola)

Type of Facility Semiconductor Plant

Floor Area (m2) 1,921

Project Value Php 28M

RNFA Scope of Work Architectural/Engineering Design & Project Management Services

Date Completed May 2001